The Work Includes selection of bridge location, detailed engineering survey, detailed geotechnical investigation (Total 450m drilling, 30m each hole), Detailed Design of 800 m Length, 50 m Span (16 Span) and width of 23.87 m Pre-stressed Concrete Box girder (Double Cell Box) structurally separated four Lane Bridge with Pile Foundation, (20m in abutment and 28m in Pier) and RCC Circular Pier and RCC Rectangular Abutment. Detailed design of 8.6 Km four lane approach road with WMM, DBM, bituminous concrete wearing course (Asphalt) and both side service lane with pre-mix carpet including 2 nos of 4 lane road over bridge (RoB) and one PSC 30m four Lane bridge over bhujela, Design of around 4 Km embankment and elliptical guide bond with all protection work, 8 spurs and river channeling work. Development of Two big ponds covering 155 hector area and two small pond covering 31 hector with Pipeline (900mm) 3.6 Km intake, spillway outlet, sluice gate, 6 nos of Island (2900 Sqm each) in pond with stair & other facilities for boating. Bio-engineering & horticultures including Environmental mitigation work. Design of Landscaping including design of two park, gardening, parking facilities for around 200 vehicle, public toilet/ bathroom, recreation area, circulation track around 4 Km, electrification work with transmission line around 1.5km and distribution system around 5 km, Transformer, street lighting for 6km with solar lighting system at bridge, park and Island including Photo-cell switching system.
Under this assignment the consultant has carried out (i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc. of the 11 bridges namely 1. Ulti Khola Bridge, 2.Naharma Bridge (Arun Khola Bridge), 3. Nepal GgandakNaharma Bridge Condtruction, 4.Keruni KholamaPakki Bridge, 5.Bhumahi Khola Bridge, 6.Ghodaha Khola Bridge, 7. Tengri Khola Bridge, 8.Kerunge Khola Bridge, 9. KhorandeKhola Bridge, 10.Sindhure Khola Bridge and 11.Kaligandaki Bridge.
Under this assignment the consultant has carried out i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc. of following 10 bridges namely 1. SewarKhola Bridge, 2. Sano Nadi Bridge, 3. GujreKhola Bridge, 4. Pranaha (Sikarbaha) Khola Bridge, 5 .Pakraha (Sikarbaha) Khola Bridge, 6. JamuanibasKhola Bridge, 7. ArjunKhola Bridge, 8. KoilabasKhola Bridge, 9. SewarKhola Bridge and 10. Thin Bagh Khola Bridge.
Under this assignment the consultant has carried out i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site Selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc of following 8 bridges namely 1) LudiyaKhola – 40 m PSC – Pile Foundation, 2) DewmaiKhola– 90 m (3*30m Span) PSC-Pile Foundation, 3) Dori Khola– 30 m PSC – Pile Foundation 4) Purano Bazar Bridge – 14 m RCC T Beam – Pile Foundation, 5) Shyano Kamal Khola – 40 m PSC- Pile Foundation, 6) MakkalDabbalkhola– 18 m RCC Team Beam – Pile Foundation, 7) Kandri (Kamdehi) Khola– 40 m PSC – Pile Foundation, 8) MawaKhola– 160 m (4*40 m Span) – PSC- Well Foundation, ix) DobholiKhola – 18 m RCC Team Beam – Pile Foundation, x) Chandu Khola-20 m RCC Team Beam – Pile Foundation.
Design A Safe, Reliable And Cost Effective Bridge Using The Appropriate Technology, works includes i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc. under this contract consultant has designed following bridges,KamdehiNadi Bridge – 25m, Bantutawa khola Bridge -20m, Bakaiya Nadi bridge -220m, Geruwa Khola Bridge -50m, Jhaj Nadi Bridge -50m, Jhaj Nadi Bridge- 60m, Maraha khola Bridge – 60m
Design A Safe, Reliable And Cost Effective Bridge Using The Appropriate Technology, works includes i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc. under this contract consultant has designed following bridges, Shiva nagar gedahi (Chandi) Nadi Bridge -50m , Rampur to Paschim Sonbarsa Bridge (Gangol -Khani Nadi) – 50m, Nirgangalal (Gangol) nadi Bridge – 40m, Gadi chapi Nadi Bridge -50m, Phandikhola harparba Bridge -25m
Design A Safe, Reliable And Cost Effective Bridge Using The Appropriate Technology, works includes i) Desk Study, (ii) Detailed Engineering Study and Survey (Feasibility Study, Geological and Geomorphology study, Bridge Site selection, Topographical Survey, Hydrological Study, Seismological Study, Environmental Study), (iii) Subsurface Exploration (Test pits and auguring, Bore-holes, field tests and laboratory tests and other informations), (iv) Analysis of Data, Conclusion and Recommendation of Design Parameters, (v) Other Studies, (vi) Detailed Design, drawings and quantity/cost estimates, (vii) Preparation and submission of Reports and their presentation to DOR (Field Report/ Preliminary Design Report, Draft Report and Final Report), (viii) Coordination of the entire work and liaison with Client etc.
Location studies, Bridge site selection, Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Jamuni Bridge – Kaliya, 50 m span.
Span 120m under Government of Nepal, Departments of Road, Bridge Project funded by World Bank for Design Build Contract.
Span 500m at Triveni under Government of Nepal, Departments of Road, Postal Highway Project for Design Build Contract.
Carry out detail inventory of all the bridges along National Highway H01, which includes bridge condition, its serviceability, GPS coordinates. Prepare and update the database of all bridges in National Highway H01 Road length 1028KM, Total no of bridge 526.