Soil Test, Site Topographical Survey, Master planning, Design for Banking hall, ATM counter, conference hall,
Detail design, drawings and detailing of Building, Planning and design of services (Water supply, sanitation, Electricity, Telecommunications and landscaping). Architectural and Engineering Design Report. Preparation of Detail cost estimate, Preparation of complete bidding documents, Construction Monitoring, Supervision, Evaluation and Certification, Preparation of Construction Drawing, Electrical Design, Solar Lighting Design.
Soil Test, Site Topographical Survey, Master planning, Design for Banking hall, ATM counter, conference hall,
Detail design, drawings and detailing of Building, Planning and design of services (Water supply, sanitation, Electricity, Telecommunications and landscaping). Architectural and Engineering Design Report. Preparation of Detail cost estimate, Preparation of complete bidding documents, Construction Monitoring, Supervision, Evaluation and Certification, Preparation of Construction Drawing, Electrical Design, Solar Lighting Design.
Topographical Survey, Master Planning of Complex, Detail design, drawings and detailing of Building. Planning and design of services (Water Supply, Sanitation, Electrical, Telecommunication and landscaping). Architectural and Engineering Design Report Preparation.
Prepare the whole Project Implementation Plan of Regional Center Building by Using Planning Tools like Primavera, MS Project etc. Prepare the construction Plan of Office Building by Using Planning Tools like Primavera, MS Project etc. Carry out the detailed topographical survey and prepare topographical map of the site to appropriate scale. Prepare the detailed Architectural and landscape design, structural as per the geotechnical investigation report, electrical, HVAC and sanitary design and prepare the working drawings for the same. Prepare the detailed quantity estimate, prepare Bill of quantities, abstract of quantities, abstract of cost, of Architectural, Landscape, structural, electrical, HVAC and sanitary systems. Prepare the Specifications, Bidding Document, and Contract Documents of Regional Center building as per Public Procurement Act 2063, Public Procurement Regulation 2064 and Public Procurement Monitoring Office Directive. Prepare Construction plan (Work Schedule), Cost and Quality Assurance Plan. Detail work includes: Detailed Topographical survey and Drawings, Geotechnical Investigation, Detail Architectural / Landscape / Interior Design and Working Drawings, Detailed Structural Design and Working Drawings, Electrical Design and Working Drawings, HVAC Design and Working Drawings, Sanitary Design and Working Drawings, Quantity and Cost Estimate, Specification and Bidding Document, Preparation of Project plan and schedules, Studio Room/Control Room, Program Production/Control Room, Master Control Room/Earth Station, Microwave Room, Editing Room, Power Distribution Room, Engineering Room, News Room, Program Rooms, Administrative Rooms, Finance Rooms, Chief of the Regional Center, Achieve Room, Prop Room, Maintenance Room, Security-Room, Registration Counter, Separate Generator Room, Building for Cafeteria, Extra Activities/Seminar Hall.
Main tasks carried out are; Review of previous studies, reports and data, liaison with the Client (TDF), Municipalities and concerning personnel and keep them informed of main activities taking place in the project., Supervision and coordination of all professional staffing inputs of the consultant., Guidance to project team member, Study Bye-laws, environment protection plan/act including ESMF approved by the GoN under UGDP-ETP, Conceptual Design and development for construction of the- proposed blacktop road, Carry out the Feasibility Study of the projects, Overall responsibility for suggesting the appropriate type of pavement and design of recommended pavement. Design of roads and off road structures, Overall responsibility for planning and design of the road side drainage, cross drainage works, Footpath.